Indicates the electric infrastructure on the property has been extended to more easily incorporate an on-site electric generation facility in the future. This would often include, for example, installing conduit and wire from the generation facility to the electric panel, designating circuits on the panel for that generation, and/or leaving room near the panel for future components, such as an inverter.